Use cases / Critical facilities
See the event. Decide with the full picture.
Designed to reduce alarm-brief preparation before an operator commits a patrol.

- Sheet
- 01 of 01
- Shows
- See the event.
- Owner
- You
Critical facilities / the situation
A sensor finding crosses a patrol route. Keep switching authority with control.
The event is at North fence sensors. It holds up the numbered places: Security control, North fence sensors and Patrol staging.
- 1
Alarm arrives without work permits
Rising threats to critical sites
- 2
Remote fence lacks visual context
Alarm overload and guard shortages
- 3
Shift handoff loses the evidence
New resilience and reporting duties
- Sheet
- 01 of 01
- Shows
- A sensor finding crosses a patrol route.
- Owner
- You
Critical facilities / the site, live / simulated
Fence alarm coincides with an authorised maintenance visit
- Sheet
- 01 of 01
- Shows
- Event, context, review and bounded response
- Owner
- You
Critical facilities / what changes / simulated
A permit review changes the inspection route.
The same shift twice, on one clock: the handoff is 9.9 min sooner with shared context. Simulated.
- Sheet
- 01 of 01
- Shows
- A permit review changes the inspection route.
- Owner
- You
Critical facilities / examples 1 to 6 of 15 / proposed
Alarm triage before dispatch.
At North fence sensors: two routes compared, Control-room operator decides.
- Event
- A perimeter alarm fires on a fence line at night.
- Decides
- Control-room operator
- Intended
- Fewer wasted call-outs and quicker attention to the alarms that matter.
- Sheet
- 01 of 01
- Shows
- Examples 1 to 6
- Owner
- You
Critical facilities / examples 7 to 12 of 15 / proposed
Drone sighting near the site.
At North fence sensors: two routes compared, Site security lead decides.
- Event
- Staff or a detection sensor report an unknown drone over the facility.
- Decides
- Site security lead
- Intended
- Staff kept safe, operations paused only where needed and a clean record for the investigation.
- Sheet
- 01 of 01
- Shows
- Examples 7 to 12
- Owner
- You
Critical facilities / examples 13 to 15 of 15 / proposed
Secure transport custody chain.
At Gatehouse: two routes compared, Security manager decides.
- Event
- Sensitive material or critical spares must move between two sites.
- Decides
- Security manager
- Intended
- Fewer losses in transit and a custody record that stands up to audit.
- Sheet
- 01 of 01
- Shows
- Examples 13 to 15
- Owner
- You
Critical facilities / machines that fit
Patrol robots inspect a fenced utility site.
- The work to review
- Patrol staging → North fence sensors
- Authority stays with Security control-room supervisor
- Access, intervention and incident disposition remain with the security supervisor.
Generic class study on this synthetic site. The class, task and operating bound need to be proved together.
- Sheet
- 01 of 01
- Shows
- Patrol robots inspect a fenced utility site.
- Owner
- You
Critical facilities / business value / simulated
Protect outage exposure and inspection visits.
of isolated work window no longer spent waiting, per alarm. Simulated.
The fence alarm is checked against the maintenance permit 14 minutes sooner, before anyone is sent.
For the head of site security / simulated
less waiting for one event.
Simulated alternative, subject to approval.
(19 − 5) waiting min × 1 = 14 outage minutes. 1 isolated work window.
How the alternative is preparedNo separate step timings are supplied.
- Context found11 scenario facts
- Alternatives tested3 waiting + travel options
- One approvalSecurity control-room supervisor
- Bounded executionStop and hold; resume in the same corridor after clearance.
A pilot would measure Alarm timestamp, Acknowledgement, Inspection attendance. Establish the baseline from your own records.
Review the alarm evidence and the approved observation corridor.
Without the prepared handoff: Alarm arrives without work permits. Travel is 11 min before and 12 min after review. No cost is assigned to rework or a missed deadline.
What a pilot would measure
- Alarm timestamp
Baseline from your own records, then the same measure in the bounded pilot.
- Acknowledgement
Baseline from your own records, then the same measure in the bounded pilot.
- Inspection attendance
Baseline from your own records, then the same measure in the bounded pilot.
- Assumed resource
- 1 isolated work window
- Calculation
- (19 - 5) min × 1 = 14 outage minutes
- Who decides
- Security control-room supervisor. Access, intervention and incident disposition remain with the security supervisor.
- Sheet
- 01 of 01
- Shows
- Protect outage exposure and inspection visits.
- Owner
- You
Critical facilities / the workflow / simulated
Agents prepare the plan. You make the call.
- Sheet
- 01 of 01
- Shows
- The event as an agentic workflow, played
- Owner
- You
Critical facilities / run it your way
Keep site observations inside the fence.
Designed to read approved records from these source categories. Site permission and integration work are required.
- Connected
- Designed for approved external services around Critical-facility perimeter work; you choose what may leave.
- Protected
- Designed to keep North fence sensors records inside your perimeter, with reviewed gateways.
- Air-gapped
- Designed for local models and controlled offline updates. Security control-room supervisor reviews each release.
- Sheet
- 01 of 01
- Shows
- Keep site observations inside the fence.
- Owner
- You
Critical facilities / next step
Bring one inspection exception.
Review the alarm evidence and the approved observation corridor.
Start with the record, the handoff and who can approve. No installed system or measured result is implied.
- Sheet
- 01 of 01
- Shows
- One event for a briefing
- Owner
- You

