Skip to content

Use cases / Energy and utilities

Keep the heat on. Check the pump first.

Designed to cut the time a vibrating pump runs unchecked, and the waiting between alarm, permit and inspection.

Energy and utilities: Combined heat and power plant in a light work setting, illustrating the proposed workflows
Illustrative sector image / proposed workflows
Your business questionA pump vibrates at the peak.
Sheet
01 of 01
Shows
Keep the heat on.
Owner
You
Find the pressure on the plan

Energy and utilities / the situation

A pump vibrates at the coldest hour. Keep the heat on and the pump checked.

The event is at District-heating pump house. It holds up the numbered places: District-heating pump house and Control room.

Where things are
123Event:District-heating pumphouseQuadruped, heldShift engineerControl roomDistrict-heating pumphouseMaintenance workshop
EventHeld up by the eventQuadrupedShift engineerPlan generated from the 3D model; synthetic, not surveyed

Combined heat and power plant / synthetic arrangement

  1. 1

    A pump vibrates at the peak

    Ageing plant and tight outage windows

  2. 2

    A load cut reaches customers

    Fewer experienced operators on every shift

  3. 3

    Isolation needs a permit

    Critical infrastructure duties under NIS2

Sheet
01 of 01
Shows
A pump vibrates at the coldest hour.
Owner
You
Play this site's event

Energy and utilities / the site, live / simulated

Vibration alarm on district-heating pump P-2 at the morning peak

ContextualizeVibration alarm on district-heating pump P-2 at the morning peak. Add history, revision, dependencies and authority.
QuadrupedShift engineerDistrict-heating pumphouseBoiler hallTurbine hallHeat accumulatorSubstation switchyardControl room
Simulated / ◇ Quadruped / ○ Shift engineer
ConnectContextualizeSimulateApproveDeployClose
Where things are
Sheet
01 of 01
Shows
Event, context, review and bounded response
Owner
You
Compare the same shift

Energy and utilities / what changes / simulated

One alarm can mean a standby switch, not a load cut.

The same shift twice, on one clock: the handoff is 22.9 min sooner with shared context. Simulated.

The site in space and time
08:01+10+20+30+40+50Simulated minutes01 / TODAY, WITHOUT SHARED CONTEXTDistrict-heating pump house teamDistrict-heating pump…Waiting 34 minShift engineer○ Shift engineerDecides after the queue formsQuadruped◇ Quadruped6 min to District-heating pump houseA load cut reaches customersA load cut reaches…Starts 34 min lateIsolation needs a permitIsolation needs a permitStarts 34 min late02 / WITH SHARED CONTEXT, AFTER APPROVALContext (sources)Context (sources)Sources answerThree alternativesThree alternativesComparedShift engineer○ Shift engineerApproves: Switch to standby P-3, inspect P-2 firstDistrict-heating pump house teamDistrict-heating pump…Waiting 7 minQuadruped◇ Quadruped9 min to District-heating pump houseHandoffHandoff 22.9 min sooner, simulated
EventWaitingTravelShift engineer approvesAuthored assumptions, not measured.
Sheet
01 of 01
Shows
One alarm can mean a standby switch, not a load cut.
Owner
You
Explore all 12 examples

Energy and utilities / examples 1 to 6 of 12 / proposed

Switching programme checked.

At Substation switchyard: two routes compared, Authorised person for switching decides.

Where things are
Switching programmecheckedDecides: Authorisedperson for switchingQuadrupedControl-room operatorSubstation switchyardExpansion vesselTransformer T2
EventProposed route, once approvedAlternativeQuadrupedControl-room operator
Event
A feeder bay in the substation switchyard must be taken out of service for maintenance.
Decides
Authorised person for switching
Intended
Fewer missed steps and out-of-date programmes, with a full record of who checked what.
Sheet
01 of 01
Shows
Examples 1 to 6
Owner
You
Next six examples

Energy and utilities / examples 7 to 12 of 12 / proposed

Pump vibration at the peak.

At District-heating pump house: two routes compared, Shift engineer decides.

Where things are
Pump vibration at thepeakDecides: ShiftengineerQuadrupedControl-room operatorDistrict-heating pumphouseCirculation pump P-1Circulation pump P-2Standby pump P-3
EventProposed route, once approvedAlternativeQuadrupedControl-room operator
Event
A vibration alarm rises on a district-heating circulation pump during a cold morning peak.
Decides
Shift engineer
Intended
Heat keeps flowing to homes while the cause is found, with evidence in hand before anyone opens the pump.
Sheet
01 of 01
Shows
Examples 7 to 12
Owner
You
See the machines that fit

Energy and utilities / machines that fit

An inspection robot walks a live pump house.

QuadrupedShift engineerDistrict-heating pumphouseBoiler hallTurbine hallHeat accumulatorSubstation switchyardControl room
Simulated / ◇ Quadruped / ○ Shift engineer
Where things are
The work to review
Maintenance workshop → District-heating pump house
Authority stays with Shift engineer
Switching, isolation and the permit to work stay with the shift engineer and the authorised person.

Generic class study on this synthetic site. The class, task and operating bound need to be proved together.

Sheet
01 of 01
Shows
An inspection robot walks a live pump house.
Owner
You
See what a buyer pays for

Energy and utilities / business value / simulated

Protect pump hours and heat delivered.

For the head of district heating operations / simulated scenario

27pump minutes

of a vibrating pump no longer left running unchecked, per alarm. Simulated.

The standby pump takes the load and P-2 is inspected after 7 minutes, not 34, with the heat kept on.

The same handoff, three waysSimulated minutes: waiting travel
Run P-2 until the next planned stop
34 + 6 min
Reduce the heat load until P-2 is checked
21 + 15 min
Switch to standby P-3, inspect P-2 first / proposed, Shift engineer approves
7 + 9 min

For the head of district heating operations / simulated

3D run ↗
27 pump minutes

less waiting for one event.
Simulated alternative, subject to approval.

Where the waiting goes pump minutes / simulated
34
Before
−27
Waiting released
7
After review

(34 − 7) waiting min × 1 = 27 pump minutes. 1 duty circulation pump at the morning peak.

How the alternative is preparedNo separate step timings are supplied.

  1. Context found11 scenario facts
  2. Alternatives tested3 waiting + travel options
  3. One approvalShift engineer
  4. Bounded executionStop and hold; resume in the same corridor after clearance.

A pilot would measure Alarm acknowledgement, Standby switchover, Inspection attendance. Establish the baseline from your own records.

Person’s decision / simulatedShift engineer

Approve the switch to standby pump P-3 and a bounded inspection of P-2.

Without the prepared handoff: A pump vibrates at the peak. Travel is 6 min before and 9 min after review. No cost is assigned to rework or a missed deadline.

What a pilot would measure

  1. Alarm acknowledgement

    Baseline from your own records, then the same measure in the bounded pilot.

  2. Standby switchover

    Baseline from your own records, then the same measure in the bounded pilot.

  3. Inspection attendance

    Baseline from your own records, then the same measure in the bounded pilot.

Assumed resource
1 duty circulation pump at the morning peak
Calculation
(34 - 7) min × 1 = 27 pump minutes
Who decides
Shift engineer. Switching, isolation and the permit to work stay with the shift engineer and the authorised person.

Simulated, not a measured result. No savings, ROI or avoided incidents are claimed.

Sheet
01 of 01
Shows
Protect pump hours and heat delivered.
Owner
You
See the workflow

Energy and utilities / the workflow / simulated

Agents prepare the plan. You make the call.

Sheet
01 of 01
Shows
The event as an agentic workflow, played
Owner
You
Choose the operating perimeter

Energy and utilities / run it your way

Keep plant data inside the plant perimeter.

Designed source reads / no connection implied
Plant process data and heat demand forecast
Asset management and permit to work
Plant process data
Asset management
Permit to work
missionGRAPHDistrict-heating pump house: evidence, dependencies and approval authority

Designed to read approved records from these source categories. Site permission and integration work are required.

Connected
Designed for approved external services around Combined heat and power plant work; you choose what may leave.
Protected
Designed to keep District-heating pump house records inside your perimeter, with reviewed gateways.
Air-gapped
Designed for local models and controlled offline updates. Shift engineer reviews each release.
Sheet
01 of 01
Shows
Keep plant data inside the plant perimeter.
Owner
You
Bring this event to a briefing

Energy and utilities / next step

Bring one pump alarm and its permit.

The event to discussVibration alarm on district-heating pump P-2 at the morning peak.

Approve the switch to standby pump P-3 and a bounded inspection of P-2.

Start with the record, the handoff and who can approve. No installed system or measured result is implied.

Sheet
01 of 01
Shows
One event for a briefing
Owner
You
Request a briefing: Energy and utilities